40% of the Driasker marina in Port Louis is already installed
Gangways design, painted in blue with a wooden top handrail, has been specially studied to be integrated into the Port Louis city historic environment.
Docks extremities are closed with the same profiles as the one used for the edges to preserve the global nice-looking of the docks.
In the same way of thinking, wooden technical gallery replace the traditionnal aluminium gallery. Electricity and water facilities are masked under the gangway and go into the docks through a special trapdoor in the decking.
More information...
Date 2009-07-22Metalu is qualified in Russia as a marina designer |
|
Date 2009-07-06Driasker restored marina will have 400 berths |
|
Date 2009-05-06A new fuel dock in Le Havre designed and installed by Metalu |
|
Date 2009-03-03The Castle Marina in Brest |
|
Date 2009-02-25New Metalu brochure |
|
Date 2008-10-15The new Castle Marina in Brest will have 750 berths |
|
