96 press releases : Marinas : Beaconing, Floating docks, Dock pedestals



Releases  1 -20
Date 2009-11-19 SF Marina 20-Year-Old Floating Breakwater Endures Gale-Force Icelandic Storm

20-Year-Old Floating Breakwater Endures Gale-Force Icelandic Storm

In early October, a strong winter storm hit Reykjavik Harbor in Iceland with 15-18 m/s average winds and gusts as powerful as 28-31 m/s. For almost two days, 1m swells pounded the dependable SF 300 Floating Breakwater from SF Marina. Even in this powerful weather, it continued to attune up to 45% of the waves. Amazing videos capturing the breakwater in action can be seen at www.sfmarinausa.com/g...


Date 2009-11-17 CanDOCK Candock Utility Chanel System

Candock Utility Chanel System

We are well aware that there are not enough marinas at this time to supply the demand for boat spaces. Some marinas have waiting lists that are more than 2 years long! We also know that a lot of projects for expansions and new marinas are slow to start because of the enormous costs of standard marina docks. The actual state of the economy also has its effects on projects. Candock can offer you ...


Date 2009-11-16 Electro-tec Leisure Systems QE2 Marina Project

QE2 Marina Project

Electro-Tec complete another phase of VX Pedestals and In Deck Units for QE2 Marina in Guernsey. Electro-Tec were commissioned to design and supply our Sentinel Commander Remote Metering System with VX Control Pedestals and In Deck remote units. The Electro-Tec systems are intended to replace the current system already installed at the 1000 berth marina. Sentinel Commander complete with Touch Scr...


Date 2009-11-10 MARTINI ALFREDO  NAUTICA DOMASO - DOMASO (CO)

NAUTICA DOMASO - DOMASO (CO)

Martini Alfredo S.p.A. are glad to announce that they have installed the first Bellingham breakwater in Italy on Como lake. By means of only 24 m of “Force 200” breakwater Martini Marinas could protect their St. Tropez floating pontoons that provide a safe mooring to 20 boats. It is now possible to appreciate also in Italy the excellent quality of the attenuators distributed by Martini Marinas.


Date 2009-11-06 IRM Ltd Marina Master version 7.0  on METS 2009

Marina Master version 7.0 on METS 2009

Marina management software solution Marina Master ver. 7.0 in addition to other improvements also offers users the opportunity to monitor vessels with RFID technology, which is a major step towards improving safety within the marina. Graphic overview in the screen shows availability in real time. All about new version we will show on METS in Amsterdam Stand 01.802 between 17 and 19 November...


Date 2009-10-28 Walcon Marine Articulating Finger Pontoon from Walcon

Articulating Finger Pontoon from Walcon

A SPECIAL PONTOON DESIGNED FOR USE AGAINST QUAY WALLS IN RIVERS OR HARBOURS. This articulating finger pontoon comprises a galvanised steel/aluminium frame with a hardwood deck and is supported on concrete floats. It has been developed specifically for locations with limited water level variation. The pontoon is available either for use with an end pile or as a cantilever from the quay wall. S...


Date 2009-10-27 SF Marina UNITED STATES COAST GUARD EMPLOYS SF MARINA DOCKS

UNITED STATES COAST GUARD EMPLOYS SF MARINA DOCKS

When the United States Coast Guard (USCG) needed heavy-duty docks that could perform in harsh marine conditions, the organization turned to SF Marina. Since then, SF Marina and its partners have installed numerous advanced Concrete Docks along the East Coast for USCG, including stations in Southwest Harbor, Maine; Bristol, Rhode Island; Long Island, New York and Burlington, Vermont on Lake Champla...


Date 2009-10-19 Gigieffe Mistral 4 16/32A electrical users and 4 1/2'' water users

Mistral 4 16/32A electrical users and 4 1/2'' water users

The distributor model Mistral consist of a structure made of stainless steel and a top made of SMC strengthened thermosetting material painted with RAL color on request. 2P+E16A/32A-230V IP66 interlocked sockets. 2x16A/32A Id=0,03mA magnetothermal differential circuit breaker for each socket. water unit with 1/2" lockable taps with reinforced nylon handle.


Date 2009-10-14 Indigo Instruments BORNEO Teak Bollard -  Environment respect and efficiency

BORNEO Teak Bollard - Environment respect and efficiency

Individual 30mA differential circuit breaker, Water and electric circuit independant, UV and marine environment resistant. Access window for circuit breakers Reversible access window, Fixtures in galvanised stainless steal Watertight auto-extinguishable box, IP56 enclosure Front lock by turn button (key in option): Configuration sur demande, 16A to 32A sockets single-phase, 16A to 64A soc...


Date 2009-10-12 MARTINI ALFREDO RODI GARGANICO (FG) MARINA

RODI GARGANICO (FG) MARINA

Martini Marinas are proud to inform that they supplied the floating pontoons and the mooring system for the 320 boats, from 8 to 40 m, moored in the marina of Rodi Garganico, the closest Italian port to Croatia, just launched on July 25th, 2009. The floating pontoons are the mod. St. Tropez Large, which assure optimum sturdiness and comfort, thanks to the 2,70 m width and the 275 Kg/m2 capacit...


Date 2009-10-07 CLIC Logique Management software, Port'Logique

Management software, Port'Logique

Port' Logique is a new management software tool for marinas created in consultation with marinas. All your needs are addressed, creatively and entirely taken care of, including: - Management of your water area; - Management of the technical zone; - Administrative management; - And all your specail needs. Easy to use, intuitive and highly performing, Port' Logique can be ...


Date 2009-10-06 MARTINI ALFREDO PORTOGOEN – PISOGNE (BS)

PORTOGOEN – PISOGNE (BS)

On June 6th had been launched the Portogoen Marina at Pisogne, delicious location on the Iseo lake. The installation consists of a 120 m pier made by Montecarlo Large floating pontoons, extremely strong and performing, having a width of 3,20 m, from which 210 m of St. Tropez pontoons equipped with finger and minifinger assure the mooring to 140 boats from 6 to 15 m.


Date 2009-10-01 Accmar Equipment Company Dock Fender by Accmar Equipment Company

Dock Fender by Accmar Equipment Company

For the month of October only, Accmar Equipment is offering a 20% discount on all BLACK dock fenders. Accmar Dock Fenders are designed to support vessels up to 90 feet in length. To ensure product durability, our dock fenders are manufactured from Virgin, UV resistant, flexible PVC material and can be mounted on recycled plastic lumber (4x4 or 2x4) or unmounted.


Date 2009-10-01 Metalu Industries International 40% of the Driasker marina in Port Louis is already installed

40% of the Driasker marina in Port Louis is already installed

Gangways design, painted in blue with a wooden top handrail, has been specially studied to be integrated into the Port Louis city historic environment. Docks extremities are closed with the same profiles as the one used for the edges to preserve the global nice-looking of the docks. In the same way of thinking, wooden technical gallery replace the traditionnal aluminium gallery. Electricity a...


Date 2009-09-21 Moser Systemelektrik MS 290 Ma - The lockable connection column for marinas

MS 290 Ma - The lockable connection column for marinas

Consisting of: 2 lateral profiles, back-wall, equipping plate, cover, bottom sheet, lockable door, equipotential bonding with protective-conductor terminal Material: profile, bottom sheet, door and cover made of anodised aluminium Equipment: 1-sided with all standard device programmes inclunding hight current and weak current devices, industrial power points, CEE-built-on points, protection...


Date 2009-09-16 ARNAVING - Mobi-Deck Mobi-Deck: The solution for the lack of berths in marinas.

Mobi-Deck: The solution for the lack of berths in marinas.

Mobi-Deck is a system of floating pontoons and mobilized motors that are applied to aid the mooring of boats (with a sail or motor and up to 20 to 50 feet in length). Thanks to a simultaneous movement only one maneuvering channel opens for several rows of breakdowns while having the vessels and moorings attached. The rapid opening of a channel (around 4 min) gives the possibility of relocating one ...


Date 2009-09-15 Nautica Italiana MEGA 2 mooring fender

MEGA 2 mooring fender

Profile studied for all facilities in concrete, it lends itself to the protection of all perimeters in marinas, dry docks, petrol station pontoons, hydrofoil/ferry moorings included. Its generous dimensions and its hard system of fixing make it suitable to protect an area where there are big boats. It is made from a soft material, which guarantees great resistance to adverse marine atmospheric co...


Date 2009-09-11 Accmar Equipment Company Power Pedestal from ACCMAR Equipment

Power Pedestal from ACCMAR Equipment

Accmar’s watertight dock power pedestals are built in the USA to withstand the harshest weather and dockside conditions following strict UL guidelines to ensure safety. Our dock pedestals are available in two sizes: 45" or 38" in height. Accmar’s power pedestal comes standard with outlet capacity for five receptacles (up to 200 AMPS max per pedestal), water faucet and one hose holder. A...


Date 2009-09-10 EZ-Dock KIT, TORPEDO ROLLERS WITH 4" (10,16 cm) POLY SPACER FOR PMAX

KIT, TORPEDO ROLLERS WITH 4" (10,16 cm) POLY SPACER FOR PMAX

Features and Benefits Since the introduction of the new EZ Port MAX we have learned a lot about the characteristics of this new product. As a result of your feedback from the field we have redesigned the current grooved rollers into an adjustable segmented roller with a poly 4” (10,16 cm) spacer. This change allows the roller to spin more freely and allows the user to adjust the 2 sections o...


Date 2009-09-07 Gigieffe Domyna prepaid 4 16/32A electrical users and 4 1/2'' water users

Domyna prepaid 4 16/32A electrical users and 4 1/2'' water users

Prepaid "Easy System" functioning: By inserting a transponder key or card provided with pre-paid credit into the sealed reader, the client can select an energy socket and/or water tap.The distributions will start as soon as the client will have extract his how key and continues until either all the credit available has been used or the operation is cancelled and the residual credit refunded simply...


- - - -



liste-press news ne En 2009-11-48-24